Project location: Shanghai
Configuration: 2MW distributed logistics park photovoltaic power generation project
Project overview
The project adheres to the core concept of "green, safe, low-carbon and efficient", maximizes the use of corporate rooftops to build photovoltaic power stations, with a total installed capacity of about 2MW and an operating mode of "self-generation and self-use, surplus power to the grid". After the project is completed, the total power generation is expected to be about 50 million kWh in 25 years, the electricity bill can be saved up to 50 million yuan, and the total CO₂ emission reduction can reach about 5,000 tons.
Project progress
Construction started in September 2024 and completed and connected to the grid in November 2024