Project location: Zhongshan City, Guangdong Province
Configuration: 338.72kWP distributed photovoltaic power generation project
Project overview
The project construction area is about 1,700 square meters, with a photovoltaic installed capacity of 338.72 kilowatts. It adopts the mode of "self-generation for self-use, surplus power to the grid" to achieve low-carbon office, green production, energy conservation and emission reduction. Based on the 25-year life of a conventional photovoltaic power station, the total power generation is about 8 million kWh, the total electricity bill savings are about 7.7 million yuan, the average annual electricity bill savings are about 50%, and the total CO₂ emission reduction in 25 years can reach 796.28 tons. The completion of the photovoltaic power station also helped Shengshi Mingmen optimize its energy structure, reduce corporate energy costs, and bring economic benefits to the company.
Project progress
Construction will start in April 2024 and is expected to be completed and connected to the grid in July 2024
Our hours
Mon 11/21 - Wed 11/23: 9 AM - 8 PM
Thu 11/24: closed - Happy Thanksgiving!
Fri 11/25: 8 AM - 10 PM
Sat 11/26 - Sun 11/27: 10 AM - 9 PM
(all hours are Eastern Time)